The Bell 214B-1 was created for Heavy Lifting, exceling at hot and high altitudes for which it was designed. A combination of extremely experienced aircrew and capable aircraft allows us to complete jobs other operators deem impossible.  

Scope of Operations Include:

  • Precision Steel Setting

  • Concrete Pours

  • Utility Pole Replacement

  • Equipment Transport / Assembly

  • Right of Way Clearing

  • Wire Pulling

With a payload of up to 3000kgs (depending on temperature / altitude) and a full range of operations gear including:

  • 100’, 150’ and 200’ Longlines C/W Remote Hook

  • Concrete Buckets

  • Auxilary Hydraulics able to operate remote tools including hydraulic grapples

  • Cargo Nets

  • Full Rigging, Bridles, Shackles and Remote Hooks

  • Certified slinging platform to move vehicles to remote locations

After a massive effort by our incredible Operations team, and partners at Rocky Mountain Lift Services, Doppelmayr and Black Tusk Helicopters, we have removed all of the cabins, pieces of the damaged cable, and have secured the main cable.
October 10th was TOWER DAY! A great day installing the lift towers. Sunny and calm and the RED team joined Summit lifts for a well orchestrated fly day. Top ...